Electrification of the Algarve Line in the Faro-Vila Real de Santo António section.
Customer
SACYR
Project Manager
DANIEL LEAO
Location
Algarve – Portugal
Año
2022
Work done
The extension of the Faro – Vila Real de Santo António section of the Algarve Line, from Pk 340+540 to Pk 396+468 (56 km).
Electrification, with the system of25 kV/50Hz, also includes the Construction of the new Loulé Neutral Zone (ZN de Loulé), to be installed at PK 322+800.