by Webmaster | Nov 15, 2026 | Electrification & catenary, Technical blog
Few electrified lines are built with a single type of overhead contact line from end to end. As soon as an alignment enters a tunnel, passes under an underbridge with tight clearance or reaches an underground station, the system that works well on plain line no longer...
by Webmaster | Oct 30, 2026 | Technical blog, Traction substations & power
An electric train carries no energy on board: it draws it from the contact wire at every instant and returns it through the rail. This means the line has to deliver power exactly where the train is, at the moment it pulls away or climbs a gradient, and do so at a...
by Webmaster | Oct 15, 2026 | Electrification & catenary, Technical blog
An electrified line almost never fails because of the wire itself, but because of the geometry with which that wire has been hung. Poorly distributed stagger, unbalanced droppers or a jammed balance weight all end up producing the same symptom: loss of contact,...
by Webmaster | Oct 1, 2026 | Electrification & catenary, Technical blog
In a metro tunnel where the crown sits just a few centimetres above the train roof, conventional electrification simply does not fit: there is no height for a messenger wire, droppers and a contact wire with its sag, and no room for the tensioning equipment at the...
by Webmaster | Sep 21, 2026 | Company, News
Instalaciones y Recursos Ferroviarios, S.L.U. (IRECFER) appears once again in the Anuario del Ferrocarril, the reference publication of the Spanish railway sector produced by the Fundación de los Ferrocarriles Españoles. We are repeating last year’s participation, and...